Open, expired, finaled: what every building permit status actually means
September 5, 2026
Permit records are public, but they are written for the people who file them. You search an address, get a list of rows, and every row carries a status word that nobody has ever explained to you.
Here is what each of them means, which ones matter when you are buying, and why the same word can mean two different things depending on which city issued it.
The four states that matter
City vocabularies vary enormously, but almost every status collapses into one of four underlying situations. Learn these and the specific wording stops mattering.
What does an open building permit mean?
The city authorised the work and has not recorded a final inspection. That is all it means. It does not tell you whether anyone is actually on site.
An open permit covers four very different realities: work still genuinely in progress, work finished years ago where nobody called the final inspection, work that failed an inspection and was never corrected, and work that stopped halfway. From outside, all four look identical. What to do when one turns up on a house you are buying.
What does an expired permit mean?
Permits are valid for a limited period. If the work is not completed and inspected inside that window, the permit lapses. The work may be perfectly finished; the paperwork simply ran out of time.
Expired often takes more effort to clear than open, because the permit may have to be reinstated or refiled before the city will inspect. It is also the more common state in some cities than finished — which is not what most buyers assume.
What does finaled mean?
The work passed its final inspection and the city considers the matter complete. Some cities say finaled, some say completed, some say closed, some issue a certificate of occupancy.
This is the record that makes work real to everyone downstream. It is what an appraiser needs to count added square footage, and what the next buyer's title company wants to see.
What does a stop-work order mean?
A building department formally halted the work. It is issued for unsafe conditions, for work going beyond what was permitted, or for work happening without a permit at all.
As a signal it is stronger than anything else on this list, because it means an inspector physically intervened. Most cities do not publish it in their open data, so its absence from a record is not evidence it never happened.
A permit that exists is not the same as a permit that closed. That single distinction accounts for most of the confusion in these records.
The statuses that look alarming and usually are not
Withdrawn, cancelled, void
The permit never became work. Someone applied, then pulled the application. Nothing was built, so there is nothing unresolved. These read as negative and are effectively neutral.
Denied
The city refused the application. Again, no work was authorised. Worth a glance if you can see something that looks like the denied work was built anyway, but on its own it is not a flag.
Expired application
Different from an expired permit, and the difference is significant. An application that expired never became a permit, so no work was ever authorised and none was abandoned. Some records make this distinction clearly and some do not.
The statuses that mislead
Issued
The trap. In some cities, issued means live work with the inspection cycle still running. In others it means a permit was granted at some point and the row was never touched again.
[DATA: Pull one contrasting pair from your own database — a city with a high terminal-state percentage against one where almost everything is still marked issued. Publish both percentages with the city names and the total row counts. This is the most concrete illustration on the page and the only part a competitor cannot write.]
There is no way to tell which kind of city you are looking at from a single permit. You have to look at how the whole city's records behave. We compared thirty of them here.
Complete, when it refers to the application
Some systems use complete to mean the application was fully submitted, not that the work finished. A record showing complete on a project you know is unfinished is usually this, rather than an error.
Reviews complete, final review, incomplete
All three describe stages of the review process rather than the state of the work. Final review means the permit is in final review, not that it finaled. Incomplete means paperwork is missing.
Certificate of occupancy, and how it differs
A certificate of occupancy is not a permit status, though it appears alongside them. It certifies that a building is legally fit to occupy. In most records a C of O effectively represents the strongest form of completion, because it usually cannot be issued until the permitted work has passed.
Watch for temporary variants. A temporary certificate allows occupancy while conditions remain outstanding, which means the permit has not finaled.
[VERIFY: Certificate of occupancy rules vary by jurisdiction, including when one is required for a residential renovation versus new construction. Check before adding anything more specific than the general point above.]
Which of these actually matter when buying
- 01Stop-work and revoked. Rare, serious, and worth a professional's opinion before you go further.
- 02Expired, on work you can see was done. It means the work exists and was never signed off.
- 03Open, if it is recent, or if there are several of them together. One old open permit in a city that rarely closes records is weak evidence of anything.
- 04Finaled records that do not cover work you can see. The gap between what was permitted and what exists is often more revealing than any single status.
The pattern matters more than any individual row. Several unresolved permits on one property suggests an owner who routinely started work without finishing the process, and that raises the odds of work that never appears in the record at all. That gap is the thing to look for on a recently renovated house.
How to check a status on a specific address
Every US city publishes permit records, most of them online. Search the address, then for each filing read two things: the work description, and whether it reached a closed state.
You can also search an address here to see the same records with the statuses already interpreted into open, expired, closed or unknown — including where a city publishes nothing that supports the distinction, in which case we say so rather than guessing.
Frequently asked questions
What does an open building permit mean?
It means work was authorised by the city and the permit has not passed final inspection. The work may be genuinely unfinished, or it may have been completed years ago with nobody booking the final visit. The record looks identical either way.
What does an expired building permit mean?
The permit ran out of time before the work passed final inspection. Permits are valid for a set period, and if the work stalls or the inspection is never called, the permit lapses. Closing one out often means reinstating or refiling it first.
What does finaled mean on a building permit?
Finaled means the work passed its final inspection and the city considers the permit complete. It is the outcome you want to see, and it is the record that makes added square footage real to a future appraiser.
What is the difference between an open and an expired permit?
An open permit is still live — the window to finish and inspect has not closed. An expired permit missed that window. Both leave the city's file unresolved, but an expired one usually takes more work to clear because it may need reinstating first.
Is a certificate of occupancy the same as a closed permit?
Not the same, but related. A certificate of occupancy says a building is legally fit to occupy, which normally means the permitted work finished and passed inspection. In many city records a C of O status is effectively the strongest form of closed.
What does a stop-work order on a property mean?
A building department formally halted the work, usually because it was unsafe, outside what was permitted, or being done without one. It is among the most serious statuses a department issues, and most cities do not publish it in their open data at all.
Does a revoked permit mean the work has to be undone?
Not automatically. Revoked means the city withdrew its authorisation, often for non-compliance. What happens next depends on the department and what was built. It is a status worth asking a professional about rather than interpreting from the record alone.
Why does the same permit status mean different things in different cities?
Because each city defines its own vocabulary and maintains its records to its own standard. Some close out the large majority of permits, so an open one is genuinely unusual. Others mark permits issued and rarely update the row afterward, which makes the same word nearly meaningless.
Check the permit history before your next showing
Search any address across our covered cities to see every permit on file, which are still open, and what the work actually was. Our free Chrome extension shows the same thing directly on Zillow and Redfin listings.
Search a propertyThis article is general information about the building permit records process. It is not legal, financial or real estate advice, and permit rules and enforcement practices vary by city. Verify anything you plan to act on with your agent, your attorney or the local building department.